Installed new drum carrier wheels and changed the drive belt while I was in it that far. Also did a massive cleaning job, clearing ductwork, remove and clean fan, get the penny out of the tumbler blade (lol), etc…. That took more time than the repair for sure. Repair was 30-60 minutes but overall with cleaning it took over 2 hours.