The instructions I read said to remove the stove control knobs, remove the screws under them and lift of the control cover. It didn't work that way. In fact you don't even need to remove the screws under the knobs.
That panel is screwed in from all sides.
I had to slide the stove out so I could reach the sides of the front panel.
I removed 4 screws from the bottom (with the over door open), and 2 screws on the sides of the panel (be careful because the whole panel comes out, you have to hold it). I rested the panel on the partially open oven door. I unplugged the 2 connecting set of wires from the membrane to the main control unit (I used needle nose pliers to hold the tabs and pulled the wires off). With a butter knife I pried the membrane off the front of the panel (it's just stuck on there with adhesive) and removed it. I fished the connectors from the new membrane through the hole and attached them to the main control unit. You can do this by hand. I peeled off the backing of the membrane and attached it to the panel like the old one ( make sure you line it up so it fits exactly). Some of the stove control pins may slide out during this process (if you removed the screws holding them in place), make sure you place them back through the holes before putting the front panel back on. Put the side screws in place first, then the bottom screws. If you removed the stove control pin screws you'll need to wiggle the pin to line up the holes for the screws. Slide the stove back in place.