Installation was a breeze. New valve is relocated inward with the supplied bracket. Be sure to route the ice maker and water dispenser lines properly to avoid the refrigerant lines.
On a scale of 1-5 for difficulty, I rank the project overall a 3, including diagnosis. Installation itself was a 1-2.