The auger gearbox shaft had a spot that was stripped of threads which prevented the auger drive from spinning the ice down the chute. I replaced the auger motor/gearbox assembly, the auger drive as it had to be cut off the shaft, and the 3 mount bolts that hold it all in place. Whole job took 30 minutes from start to finish which included cutting off the drive bracket.